}
0800 12345678 [email protected]

Our Case Studies

Our case studies showcase  examples of how our solutions effectively address client challenges and drive measurable results.

Gantry crane inside factory building

Wide Span Gantry
Crane Challenge

A client called for assistance

with their extremely wide

span gantry bridge cranes,

one of the widest space

frame gantry bridge crane

systems in Europe.

 

Read More……..

Snowplough clearing snow from road

Emergency Heating – On An Industrial Scale

During a winter

emergency national gas

shortage, our client was

instructed by Transco to

isolate their 3 MW natural

gas heating supply.

 

Read More……..

Inside large modern factory

Utilities Design & Install
for Aerospace Production

Our UK client purchased

cutting edge Technology

from a European

Multinational Aerospace

Manufacturing Supplier.

 

 

Read More……..

Car driving through floodwater

During a great flood in
Ayrshire

Autumn 2012 Ayrshire, our clients

manufacturing campus was

suddenly subject to a 1 in a 100 year

rainfall event. So significant the

adjacent international airport

runway was submerged.

 

Read More……..

Construction of concrete foundation

Precision Aerospace
Machine Foundation

An aerospace manufacturing

client required a precision

machine base for their cutting

edge robotic test equipment,

in the middle of a live production line.

 

Read More……..

 

Mounted CCTV camera

Secure Campus Advanced CCTV Network

If traditional CCTV technology

no longer meets your security

needs, you might need an

advanced IT network CCTV

system instead – we can help

 

 

Read More……..

Coming Soon…

 

>  When a storm collapsed a storm proof industrial HGV door.

 

>  When undocumented power cabling delayed construction of a new £15M building.

 

>  A client’s compliance audit required us to quickly develop their permit to work system.

 

>  A client’s 11000V power network reliability led us to survey and upgrade their 50+ year old power cabling.